Our team of project managers include Registered Roof Observers (RRO), Project Management Professionals (PMP) and HAAG Engineering Certified Inspectors.
Key responsibility is to ensure that the roof and/or fall protection system installation complies with written specifications, drawings, applicable building codes, industry standards and proven technologies.
As well, our project managers minimize customer liability through frequent inspections during roof project and ensure installation complies with contract specifications and manufacturer’s installation requirements.
RMIS Engineering shall prepare a pre-construction meeting notice and agenda to be distributed to the Owner, Owner’s Representative, Contractor, Facility Operator and others as requested by the Owner or Contractor.
RMIS shall chair the meeting and review topics including site safety, public safety, hazard identification, emergency response and other applicable regulations and policies. Project specifications, drawings, work schedule, inspection criteria, reporting procedures, invoicing procedures, communication procedures, material storage, site set-up, and coordination with facility occupants will be reviewed. Pre-construction photos of the interior, exterior and grounds will be obtained and filed for future reference. Copies of the meeting notes will be distributed to all attendees.
As new materials arrive on site they will be inspected and tested as necessary to determine compliance with specifications. Non-compliant materials will be tagged and the Contractor will be ordered to remove such materials from site.
As new materials are installed, RMIS will perform quality assurance inspections approximately every 3 installation days to ensure compliance with specifications and drawings. Non-compliant work will be rejected and the work will be effectively repaired or replaced as directed by RMIS. A Construction Field Report will be issued for each field inspection identifying the work progress, actions required for any identified issues and photos of the work. Issues that arise as a result of unforeseen site conditions are vetted and resolved through collaborative measures with assistance from RMIS Engineers.
Upon completion of the work RMIS will perform a final inspection and will document any deficiencies in the work. the Contractor will be ordered to correct the noted deficiencies and upon correction of the deficient work, will call for a final inspection. when RMIS is satisfied that all deficiencies have been corrected, a letter of completion will be issued to the Contractor instructing him to provide final closing documentation for review and approval by RMIS. RMIS will forward all required closing documents to the Owner and Provide written documentation stating the Contract has been satisfactorily performed.
Quality Assurance inspections provided by RMIS Engineering ensure the approved contractors installation methods comply with the industry standards and project specifications.
Review of project specifications and drawings.
Attendance of pre-construction meeting.
Quality assurance inspections during roof installation and post-construction, each quality assurance inspection includes a report identifying construction progress and deficiency identification.